Pool design and construction process placeholder
How We Build

Our Process
From Plan to First Swim

Thirteen stages, each one inspected before the next begins. Here’s exactly what happens in your backyard, in order — so you always know where the build stands.

Start Your Project
  1. 01
    01
    Step 01

    Layout

    Your approved 3D design becomes paint and stakes in the actual yard. We walk the footprint with you, confirm elevations against the plan, and clear the pre-excavation inspection before any digging starts.

    • Site staking
    • Footprint & elevations
    • Excavation inspection
  2. 02
    02
    Step 02

    Dig

    The excavator follows the staked outline down to engineered depth, cutting the floor profile, steps, and benches as drawn. Spoil is hauled off the same day whenever access allows.

    • Shape & depth
    • Steps & benches
    • Haul-off
  3. 03
    03
    Step 03

    Steel

    Crews tie a continuous rebar cage across the floor and walls to the engineer's schedule. It's what turns a hole in the ground into a structure — and it's inspected before anything covers it.

    • Rebar cage
    • Steel bonding
    • Pool steel inspection
  4. 04
    04
    Step 04

    Pre-Plumbing

    Suction, return, and feature lines are trenched and stubbed in, then capped and pressure-tested. Lines hold test pressure through the next stages so any leak shows up now, not under a finished deck.

    • Returns & drains
    • Feature lines
    • Skimmers
  5. 05
    05
    Step 05

    Gunite

    Pneumatically-applied concrete is shot over the steel to form the shell — the single biggest day of the build. The shell then cures for several days, with periodic wet-downs to cure evenly.

    • Shotcrete shell
    • Steps & spa
    • Curing
  6. 06
    06
    Step 06

    Plumbing

    The full circulation system is completed and tied to the equipment pad location — skimmers, returns, drains, and any spa or feature plumbing — and pressure-tested again as a complete loop.

    • Pressure test
    • Underground electrical
    • Equipment runs
  7. 07
    07
    Step 07

    Close Trenches & Bonding

    With plumbing verified, trenches are backfilled and compacted, and the bonding grid is connected around the shell perimeter. The bonding inspection signs off the electrical safety envelope.

    • Backfill
    • Bonding grid
    • Grounding inspection
  8. 08
    08
    Step 08

    Tile & Coping

    Waterline tile and coping go on next — the details you'll actually touch every day. Layout, grout color, and corner cuts are checked against the design selections before setting.

    • Waterline tile
    • Coping stone
    • Spa spillway
  9. 09
    09
    Step 09

    Footer and/or Retaining Wall

    Where the site needs it, footers and retaining walls are formed, steeled, and poured now, so grade changes and raised features are structurally settled before deck work begins.

    • Structural footer
    • Retaining wall
    • Engineered & inspected
  10. 10
    10
    Step 10

    Deck & Equipment

    The deck is formed, poured or set, and finished, while the pump, filter, heater, and automation are mounted and plumbed at the equipment pad.

    • Pavers & travertine
    • Pumps & filter
    • Heater & automation
  11. 11
    11
    Step 11

    Electrical

    A licensed electrician wires the equipment pad, lighting, and controls, and completes the final electrical inspection — including GFCI protection for everything near the water.

    • Equipment wiring
    • LED lighting
    • Safety inspection
  12. 12
    12
    Step 12

    Fence / Screen

    Barrier requirements are completed and verified — fencing, self-closing gates, alarms, or screen enclosure, per your jurisdiction — because the plaster stage can't be scheduled without it.

    • Safety barrier
    • Screen enclosure
    • Pool safety inspection
  13. 13
    13
    Step 13

    Plaster

    Interior finish is applied in a single continuous pour, and the pool begins filling immediately. We handle startup chemistry across the first weeks and walk you through your new routine at handoff.

    • Mini-pebble / quartz
    • Fill & balance
    • Final inspection

Built to Last

A warranty you can count on

  • Structural Pool Shell

    The structural shell is built to the engineered plan and covered by clearly documented demo warranty terms.

  • Limited Pool Interior

    Interior-finish coverage and owner care requirements are explained before the construction agreement is signed.

  • Manufacturer Pool Equipment

    Pumps, filters, heaters, and controls carry the applicable manufacturer coverage for the selected equipment.

Ready to Start?

Start with a clear plan

Share your property and goals. We’ll explain what happens before design, permitting, and construction begin.